AMRUT 2.0 Student Internship Programme

WELLS Management

Download the official AMRUT 2.0 mobile application, follow the student instructions, and access the app correctly for well verification, field reporting, and submission.

App Based
Well verification work is completed through the mobile app only.
Field Ready
GPS, camera, internet, and storage permissions must be enabled.
Student Support
Use the PDF instructions if you need help during installation or access.

How To Download And Access

  1. Click the Download Mobile App button on this page.
  2. Install the APK on your Android mobile device.
  3. Allow installation permission if your phone asks for it.
  4. Open the app and allow location, and camera permissions.
  5. Use the assigned process or credentials provided under the internship programme.
  6. Open your assigned task and start the well verification activity from the app.
Important: If the APK does not install, enable installation from unknown sources in your phone settings and try again.

Instructions For Students

  • Verify the correct well connection details before submission.
  • Upload only clear and valid field photographs taken from the actual location.
  • Ensure latitude and longitude are captured correctly at the site.
  • Do not submit incomplete, duplicate, or incorrect records.
  • Keep internet enabled until the field data is properly synced.
  • Refer to the PDF guide whenever you face difficulty in the process.

Benefits For Students

  • Internship completion certificate as per programme rules.
  • Stipend support for successful and verified work, subject to programme terms.
  • Practical experience in field data collection and reporting.
  • Exposure to real implementation work through mobile-based verification.

Before You Start

  • Charge your phone properly before going to the field.
  • Turn on GPS/location services and keep them accurate.
  • Make sure the camera permission is allowed for the app.
  • Use the latest APK version from the official download link only.
  • Keep your assigned well or connection information ready before submitting.